Pre-launch · ZUBA
Zuba Molas Plaza
Santísima Trinidad, Asunción
From US$ 46,800
The project
Discover the property
Towers above a retail podium on Av. Molas López, with home automation in the units
Zuba Molas Plaza comprises towers ZUBA 28, 29 and 30, with 483 units listed on the official reservations page. ZUBA 28 has 19 floors; the other two have 24 floors and two extra levels.
On November 1, 2026, 98 units were available. The lowest list price was USD 46,800 for a 29 m² studio. There are also 1- and 2-bedroom units and a 61 m² duplex.
- Towers
- 3 (ZUBA 28, 29 e 30)
- Units
- 483
- ZUBA 28 floors
- 19
- ZUBA 29 and 30 floors
- 24 + 2 níveis EP
- Available on Nov 1, 2026
- 98
Images
Gallery
7 images
Images published by the developer. Renderings may be illustrative.
Infrastructure
Features and highlights
- Pool and sun deck
- Quincho with coworking
- Barbecue grills
- Retail podium
- Home automation
- Laundry
- Elevators
- Parking
Units
Floor plans and unit types
Unit types
Studio
29 m² · 30 available on Nov 1, 2026
From US$ 46,800
I'm interested in this unit typeJunior with balcony
35 m² · 7 available on Nov 1, 2026
From US$ 55,100
I'm interested in this unit type1 bedroom
38 – 46 m² · 33 available on Nov 1, 2026
From US$ 59,500
I'm interested in this unit type2 bedrooms with balcony
63 m² · 26 available on Nov 1, 2026
From US$ 98,300
I'm interested in this unit type1-bedroom duplex
61 m² · 1 available on Nov 1, 2026
From US$ 128,200
I'm interested in this unit type2-bedroom Duplex Plus
87 – 92 m²
Sold out
Floor plans
Tower 1 · typical floor
Tower 1 · upper typical floor
Tower 2 · podium and mezzanine
Tower 2 · typical floor A
Tower 2 · typical floor B
Tower 2 · typical floor C
Tower 2 · upper floors and duplexes (A)
Tower 2 · upper floors and duplexes (B)
Pricing
Commercial terms
Published commercial terms
Price from
US$ 46,800
29 m² studio · list of 28 Sep 2026
Currency: USD
Last commercial update: 11/1/26
Works
interest-free payments during construction
5 years
ZUBA developer financing
- Installments:
- Interest-free during construction or developer financing up to 5 years
List prices of the units available on 28 Sep 2026 (towers 1, 2 and 3). Minimum 20% down and up to 60 installments; during-construction and cash prices are also available. Ask for the current list on WhatsApp.
Optional items
- Parking sold separately
Availability, prices and terms may change and must be confirmed before any negotiation.
Talk to Karine about this property
The area
Location and surroundings
On Avenida Dr. Felipe Molas López, in the Santísima Trinidad neighborhood, a main route to Las Lomas and northern Asunción.
- City:
- Asunción
- Neighborhood:
- Santísima Trinidad
- Address:
- Avda. Dr. Felipe Molas López
Nearby points
- Avenida Artigas, according to a broker listing
Who is behind it
Meet the developer
ZUBA
Residential buildings with compact units (studios, 1 and 2 bedrooms) aimed at the middle class, sold off-plan with in-house financing.
ZUBA was incorporated in May 2017 by Valentina Basaglia and Alejandro Zuccolillo Quevedo, who each held 50% of the capital as of 30 November 2024. The bond prospectus records completion of the first building in 2019 in Fernando de la Mora, and delivery of Zuba 2 and Zuba 3 in 2021.
After the Fernando de la Mora and Luque area, the company launched Zuba 9 in Encarnación in 2022 and Zuba 12 in Ciudad del Este in 2023. FIX SCR's November 2024 report cites 8 buildings developed and sold, totalling 39,847 m².
- First Paraguayan developer with an investment-grade rating, according to the company and sponsored or company-based articles. The verifiable rating is A-py, stable outlook, from FIX SCR (a Fitch affiliate), confirmed on 19 November 2025.
- According to the company, it offers project development, financing, after-sales and investment management.
- According to FIX SCR, ZUBA also manages the buildings and keeps some of its own units for rent.
Verified figures
- Under construction
- 6
- Unique developments with an official September 2026 progress report, all below 100%: Zuba Plaza, Zuba 19, Zuba+ 20-21, Zuba 22, Zuba+ 23 to 26 (Trinidad) and Zuba 27. This equals 13 listed towers. It is a floor: other works may lack a published report. The website states "11 buildings under construction" without detail.
- As of 9/30/26
- Years active
- 9
- Calculated from the stated founding year, 2017.
Similar properties
Pre-launchZUBA
Zuba 43 Centro Don Bosco
Centro, Asunción
- Studio · 1, 2 bed
- 25 – 50 m²
- Delivery: June 2029
From
US$ 43,800
Under constructionZUBA
ZUBA+ Trinidad
Trinidad, Asunción
- Studio · 1, 2 bed
- 28 – 55 m²
- Delivery: December 2027 to December 2028, depending on the tower
From
US$ 47,300
Under constructionCRESIA
VIVO Las Lomas
Las Lomas, Asunción
- Studio · 1, 2 bed
- 30 – 67 m²
- Delivery: Expected: September 2028
From
US$ 63,000


