Pre-launch · ZUBA

Zuba Plaza CDE

Ciudad del Este

From US$ 47,800

The project

Discover the property

Five-tower complex with a retail podium, built in two phases in central Ciudad del Este

Zuba Plaza CDE appears on the official reservations page with five towers: ZUBA 31, 32, 33, 40 and 41. The official table totals 573 units, more than in the listings reviewed.

On November 1, 2026 there were 139 units available, the lowest at a list price of US$ 47,800. Brokers indicate delivery from June 2029 onward, by tower. The address needs official confirmation.

Towers
5
Units on the official table
573
ZUBA 31 levels
19
ZUBA 32 levels
16
ZUBA 33 levels
16
ZUBA 40 levels
20
ZUBA 41 levels
17
Available on Nov 1, 2026
139

Images

Gallery

8 images

Images published by the developer. Renderings may be illustrative.

Infrastructure

Features and highlights

  • Pool
  • Sun deck
  • Coworking
  • Barbecue grills
  • Laundry
  • Elevators
  • Home automation
  • Retail podium (dining, health and shops)
  • Parking

Units

Floor plans and unit types

Unit types

Floor plans

  • Studio · 29 m²

  • 1-bedroom Junior · 32 m²

  • 1-bedroom Junior with balcony · 33 m²

  • 1-bedroom Estándar · 38 m²

  • 2 bedrooms (Mariposa) · 61 m²

Pricing

Commercial terms

Published commercial terms

Price from

US$ 47,800

list price · 29 m² studio (Zuba 32)

Currency: USD

Last commercial update: 11/1/26

  • 20%

    minimum down payment

  • Works

    interest-free installments during construction

  • 5 years

    or ZUBA developer financing

  • Bank

    or bank financing

Down payment:
20%
Installments:
Interest-free during construction, developer financing up to 5 years or bank financing

Three prices per unit: list, during construction and cash. The starting figure shown is the list price of the 29 m² studio in tower 32 (USD 47,800; USD 40,500 cash), per the official reservations page on November 1, 2026. Financing options per the official Zuba Plaza CDE brochure; minimum 20% down payment per the official payment calculator. ZUBA’s Sep 15, 2026 project sheet lists a construction-period plan of up to 40 months. Deliveries: towers 31 and 32 in Jun 2029, tower 33 in Dec 2029, towers 40 and 41 in Jun 2030.

Optional items

  • Parking sold separately

Availability, prices and terms may change and must be confirmed before any negotiation.

The area

Location and surroundings

In Ciudad del Este, a border city next to Foz do Iguaçu (Brazil) and the commercial hub of Alto Paraná. Zuba 12, already delivered by ZUBA, is in the same city.

City:
Ciudad del Este
Address:
The exact address is not publicly stated.

Nearby points

  • Ruta 2, about 100 m away, according to a broker listing

Who is behind it

Meet the developer

ZUBA

Residential buildings with compact units (studios, 1 and 2 bedrooms) aimed at the middle class, sold off-plan with in-house financing.

ZUBA was incorporated in May 2017 by Valentina Basaglia and Alejandro Zuccolillo Quevedo, who each held 50% of the capital as of 30 November 2024. The bond prospectus records completion of the first building in 2019 in Fernando de la Mora, and delivery of Zuba 2 and Zuba 3 in 2021.

After the Fernando de la Mora and Luque area, the company launched Zuba 9 in Encarnación in 2022 and Zuba 12 in Ciudad del Este in 2023. FIX SCR's November 2024 report cites 8 buildings developed and sold, totalling 39,847 m².

  • First Paraguayan developer with an investment-grade rating, according to the company and sponsored or company-based articles. The verifiable rating is A-py, stable outlook, from FIX SCR (a Fitch affiliate), confirmed on 19 November 2025.
  • According to the company, it offers project development, financing, after-sales and investment management.
  • According to FIX SCR, ZUBA also manages the buildings and keeps some of its own units for rent.

Verified figures

Under construction
6
Unique developments with an official September 2026 progress report, all below 100%: Zuba Plaza, Zuba 19, Zuba+ 20-21, Zuba 22, Zuba+ 23 to 26 (Trinidad) and Zuba 27. This equals 13 listed towers. It is a floor: other works may lack a published report. The website states "11 buildings under construction" without detail.
As of 9/30/26
Years active
9
Calculated from the stated founding year, 2017.

Similar properties

Back to properties