KarineCORRETORA PY

Under construction · CRESIA

Magnolia

Área 1, Ciudad del Este

From US$ 346,300

The project

Discover the property

Starting price published at launch in April 2026. Current price and availability depend on confirmation.

Just 10 residences of around 240 m² — CRESIA’s "houses in the sky" concept in Área 1

Magnolia is a vertical residential building by CRESIA in Área 1, Barrio Boquerón, Ciudad del Este. It has five floors and only 10 apartments, which the company calls high-rise residences. It is therefore an apartment building, not a gated community of houses.

The press reports three-bedroom units of around 240 m², without stating whether that area is total or covered. The official website mentions a kitchen with island, double access and a terrace-balcony with retractable glass enclosures. The top level houses a pool, solarium, air-conditioned events room and children's play area.

The launch and start of construction took place in April 2026, with an estimated build time of about 28 months and delivery scheduled for 2028.

Type
Low-density vertical building
Floors
5
Units
10
Area per unit
Around 240 m², area type not stated
Bedrooms
3 en suite
Construction period
About 28 months

Images

Gallery

10 images

Images published by the developer. Renderings may be illustrative.

Infrastructure

Features and highlights

  • Top-floor pool with sun deck
  • Air-conditioned event room
  • Children’s play area
  • Balcony terrace with barbecue and retractable glass
  • High-end kitchen with island
  • Double entrance in every residence

Units

Floor plans and unit types

Unit types

Pricing

Commercial terms

Published commercial terms

Price from

US$ 346,300

launch price · April 2026

Currency: USD

Last commercial update: 4/9/26

Availability, prices and terms may change and must be confirmed before any negotiation.

The area

Location and surroundings

In Área 1 of Ciudad del Este (Boquerón neighborhood), a leafy residential district near Lago de la República, the Friendship Bridge and the university campuses.

City:
Ciudad del Este
Neighborhood:
Área 1
Address:
Calle Los Naranjos, entre Yrupé y Palo Santo, Área 1, Barrio Boquerón, Ciudad del Este

Nearby points

  • Lago de la República
  • Shopping París
  • Friendship Bridge
  • Paraná Country Club
  • Catholic University, Alto Paraná campus
View location on Google Maps

Who is behind it

Meet the developer

CRESIA

Structures, develops and sells residential and mixed-use buildings through its VIVO and Paseo lines and corporate and mixed-use projects. According to the company, it also provides rental and condominium management.

The press describes CRESIA as the result of an alliance between builder Codas Vuyk S.A., active since 1978, and Pridelta Capital S.A. Its corporate page names Santiago Gómez Carrillo and Andrés Torres Carbonell, linked to Pridelta, and Gonzalo Codas and Diego Vuyk, linked to Codas Vuyk, as directors and co-founders.

In Encarnación, the first project cited is Paseo de los Teros, with 60 apartments, delivered in 2023 according to trade press. VIVO Costanera followed, opened in June 2025, as did Paseo del Sol, under construction since March 2024.

  • According to the company, it covers project structuring, development and management through to delivery.
  • According to the company, more than 350,000 m² developed, with a presence in Asunción, Ciudad del Este and Encarnación. The figure includes group history and has not been independently audited.
  • According to the company, it manages each VIVO Las Lomas apartment after delivery under a hotel-style operation.

Verified figures

Under construction
8
Unique projects labelled "En ejecución" on CRESIA's official list, across the three cities: VIVO Las Lomas, VIVO Los Naranjos, VIVO Los Guayabos, Magnolia, Paseo Boquerón, Paseo Lomas, Paseo del Sol and Paseo Mboi Ka'e. Link Center is excluded because it remains labelled as a launch.
As of 10/30/26
Announced
2
Unique projects labelled "Nuevo lanzamiento" on the official list: Link Center and VIVO San José. Boquerón Plaza, presented in October 2026, is excluded because it was not yet on the official list.
As of 10/30/26

Similar properties

Back to properties