Under construction · CRESIA
VIVO Los Naranjos
Área 1, Ciudad del Este
The project
Discover the property
Spacious two- and three-bedroom homes in quiet Área 1, with full amenities and ground-floor shops
VIVO Los Naranjos is a six-storey residential building in Área 1, Ciudad del Este, at the corner of Los Naranjos and Los Guayabos streets. It is CRESIA's third project in the city, built by Codas Vuyk with the participation of Pridelta Capital.
Published plans show two- and three-bedroom apartments from 88.35 to 171.63 m², plus three ground-floor shops. The rooftop has a pool with deck, raised solarium, barbecue quincho, outdoor lounge with pergola, gym and children's area.
Construction began in November 2025, with an estimated duration of about 30 months. CRESIA gives 2027 as the expected delivery date, which still needs to be confirmed against that timeframe.
- Floors
- 6
- Units
- 38, according to the company
- Ground-floor shops
- 3
- Builder
- Codas Vuyk
- Construction period
- About 30 months
Images
Gallery
10 images
Images published by the developer. Renderings may be illustrative.
Infrastructure
Features and highlights
- Pool with deck
- Equipped gym
- Quincho with barbecue
- Outdoor lounge with pergola
- Children’s play area
- Changing rooms with showers
- Three ground-floor retail units
- 36 parking spaces
Units
Floor plans and unit types
Unit types
2 bedrooms
88.35 – 88.8 m² · floors 1–6
On request
I'm interested in this unit type2 bedrooms with patio
120.95 m² · floor 1
On request
I'm interested in this unit type3 bedrooms
142.45 – 147.5 m² · floors 1–6
On request
I'm interested in this unit type3 bedrooms with patio
171.63 m² · floor 1
On request
I'm interested in this unit type
Pricing
Commercial terms
Price on request
There is no confirmed public price. Ask for the current list on WhatsApp.
Currency: USD
Availability, prices and terms may change and must be confirmed before any negotiation.
Talk to Karine about this property
The area
Location and surroundings
In Área 1 of Ciudad del Este, at Los Naranjos and Los Guayabos, a few minutes from downtown, Lago de la República, universities, malls and restaurants.
- City:
- Ciudad del Este
- Neighborhood:
- Área 1
- Address:
- Calle Los Naranjos esq. Los Guayabos
Nearby points
- Lago de la República
- Shopping París
- Friendship Bridge
- Paraná Country Club
- Catholic University, Alto Paraná campus
- VIVO Los Guayabos, the neighbouring building
Who is behind it
Meet the developer
CRESIA
Structures, develops and sells residential and mixed-use buildings through its VIVO and Paseo lines and corporate and mixed-use projects. According to the company, it also provides rental and condominium management.
The press describes CRESIA as the result of an alliance between builder Codas Vuyk S.A., active since 1978, and Pridelta Capital S.A. Its corporate page names Santiago Gómez Carrillo and Andrés Torres Carbonell, linked to Pridelta, and Gonzalo Codas and Diego Vuyk, linked to Codas Vuyk, as directors and co-founders.
In Encarnación, the first project cited is Paseo de los Teros, with 60 apartments, delivered in 2023 according to trade press. VIVO Costanera followed, opened in June 2025, as did Paseo del Sol, under construction since March 2024.
- According to the company, it covers project structuring, development and management through to delivery.
- According to the company, more than 350,000 m² developed, with a presence in Asunción, Ciudad del Este and Encarnación. The figure includes group history and has not been independently audited.
- According to the company, it manages each VIVO Las Lomas apartment after delivery under a hotel-style operation.
Verified figures
- Under construction
- 8
- Unique projects labelled "En ejecución" on CRESIA's official list, across the three cities: VIVO Las Lomas, VIVO Los Naranjos, VIVO Los Guayabos, Magnolia, Paseo Boquerón, Paseo Lomas, Paseo del Sol and Paseo Mboi Ka'e. Link Center is excluded because it remains labelled as a launch.
- As of 10/30/26
- Announced
- 2
- Unique projects labelled "Nuevo lanzamiento" on the official list: Link Center and VIVO San José. Boquerón Plaza, presented in October 2026, is excluded because it was not yet on the official list.
- As of 10/30/26
Similar properties
Under constructionVierci Development
V Tower Del Lago
Boquerón, Ciudad del Este
- Studio · 1, 2, 3 bed
- 32.3 – 293.6 m²
From
US$ 64,600
Under constructionCRESIA
Paseo Boquerón
Boquerón, Ciudad del Este
- 1, 2 bed
- 47.5 – 95.1 m²
- Delivery: May 2028 (expected)
From
US$ 63,900
Under construction